Housedeck Developer - Features & Benefits

Reduced Cost

  • Housedeck is comparable in cost to traditional pile and beam and in many cases should be less expensive
  • No engineered piling mat is usually required
  • Wide range of foundations methods available to suit individual site requirements
  • Less dig and associated muck away and landfill costs
  • Lower preliminary costs
  • Lower supervision costs

Reduced Time

  • 20% to 50% saving in programme time compared to traditional systems.

Reduced Commercial Risk

  • Programme timetable is more assured
  • Reduced risk of project cost overrun
  • Lower risk of incurring liquidated damages
  • No overdig or extra depth
  • No risk of excavation collapse in inclement weather and costs for pump out
  • Reduced Health & Safety issues
  • Pile locations can be quickly changed to avoid obstructions and save on costly redesign work
  • Highest construction tolerances in UK ensure a greatly lower chance of post construction issues

Safer

  • No craneage of pre-cast units – eliminates overhead and lifting hazards
  • No excavations – falling and collapse hazards
  • First stage of construction is safe level working platform – reduced trip hazards

Quality Assured

  • BSI ISO:9001 approved system
  • LANTAC approved system
  • Simplified inspection for building control

Features

  • Any shape building is possible without undue cost increase
  • Easy gas membrane installation
  • Housedeck system has inherent protection against gas migration