Housedeck Slab Ready to Pour

Another Housedeck slab fixed and ready to pour. Have a project needing a new foundation? Talk to us.

A 180mm void was required due to the potential for heave and was achieved by using our Deck Support Units (DSUs). As the DSUs are recovered a completely clear void is provided.

This project also required a cantilever section and a hybrid flat slab with local down stand thickenings was designed and installed by Abbey Pynford.