One property was to be underpinned using a piled raft underpinning scheme and the other was to be underpinned and re-leveleved.
Jacking was achieved by bolting lifting frames to fixing cast into the raft slab at each pile position and by installing Abbey Pynford AutoProps between the frames and jacking tubes protruding from the top of each pile.

| Attachment | Size |
|---|---|
| Hemlock Close Aylesbury Actual.pdf | 337.54 KB |