The Gables

Milton Keynes

Value: £480,000

Size: 2625m2 (multiple slabs)

Duration: 27 weeks

Rig: 13.5t Midi Piling Rig

Scope of work:

  • Abbey Pynford teamed up with Mears New Homes to design and build foundations for an exclusive development.
  • We designed and installed 225mm thick reinforced concrete slabs using our patented Brick Support Unit edge shutter system.
  • In the areas of the site with contaminated soil we installed 725No. 250mm diameter Rotary Displacement Piles to a depth of 7.5m, eradicating spoil. Housedeck also reduced the excavation required, (due to no requirement for a piling matt or ground beams) reducing the cost of disposal of contaminated spoil.
  • In the areas with non-contaminated soils we installed 70No. 250mm diameter CFA piles, to a depth of 7.5m.