Basement Creation Beneath Grade II Listed Town Hall in St Albans

Basement Creation Beneath Grade II Listed Town Hall in St Albans

Value: £700k<

Size: 200m2

Duration: 34 weeks

Scope of work :

  • Temporary works design and stability calculations
  • Construction of excavated reinforced concrete Underpins
  • Reduced level excavation
  • Creation of links between basement areas
  • Ground bearing basement slab
  • ASUC guarantee
  • Works undertaken for a leading national contractor

Download PDF Version: Click Here (Coming Soon)

Open site Basement adjoining sensitive structures in Marylebone

Open site Basement adjoining sensitive structures in Marylebone

Value: £1m>

Size: 210m2

Duration: 34 weeks

Scope of work :

  • Full design with finite element analysis
  • Installation of penetration Bored Pile Wall
  • Reduced level of excavation and trimming of existing foundation
  • Temporary propping
  • Below slab drainage and sumps
  • Reinforcement concrete works including Basement slab, composite lining walls and ground floor soffit slab
  • Water resisting concrete additives
  • ASUC guarantee
  • All undertaken through restricted access archway

Download PDF Version: Click Here (Coming Soon)

3 Storey Retro fit Underpinning Basements in Kensington

3 Storey Retro Fit Underpinning Basements in Kensington

Value: £2m<

Size: 320m2

Duration: 83 weeks

Scope of work :

  • Design of temporary works, piling and transfer structure
  • Demolition and Excavation
  • 3 level reinforced concrete, underpinning to entire parameter
  • Lower ground floor level transfer slab
  • Restricted Access temporary and permanent works piling
  • Top down construction sequence
  • Replacement of existing installation
  • Supply installation temporary works
  • Below slab drainage sumps and lift pit
  • Water resisting concrete additives
  • ASUC Guarantee

Download PDF Version: Click Here (Coming Soon)