3 Storey Retro Fit Underpinning Basements in Kensington

Value: £2m<

Size: 320m2

Duration: 83 weeks

Scope of work :

  • Design of temporary works, piling and transfer structure
  • Demolition and Excavation
  • 3 level reinforced concrete, underpinning to entire parameter
  • Lower ground floor level transfer slab
  • Restricted Access temporary and permanent works piling
  • Top down construction sequence
  • Replacement of existing installation
  • Supply installation temporary works
  • Below slab drainage sumps and lift pit
  • Water resisting concrete additives
  • ASUC Guarantee

Download PDF Version: Click Here (Coming Soon)