School in Balham

London

Value: £500,000

Size: 167m2

Duration: 34 weeks

Scope of work : 

  • Single storey basement constructed partly beneath an existing school building
  • Top down construction sequence to maximise the full utilisation of the school’s playground
  • Installation of transfer ground floor slab supported on temporary structural steel work design by Abbey Pynford
  • Excavation & completion of basement structure
  • Specialist concrete finish to suit architectural requirements
  • Restricted Access Piling for the construction of king post retaining wall – designed by Abbey Pynford
  • Water resisting concrete additives
  • This project was completed 3 weeks ahead of the program, saving costs and time